Télécharger Imprimer la page

V-TAC VT-6056-4 Manuel D'instructions page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
STEP 4. INSTALL THE CEILING FAN
• If you are using the Flush Mount system skip this step.
• Slide the ceiling canopy up into place over the ceiling
mounting bracket (see figure 13). The two screws on the
side of the mounting bracket face should slip through the
key hole slots in the canopy then tighten both screws.
• Depending on how deep the electrical junction box was
installed in the ceiling you might have a slight gap
between the ceiling canopy and ceiling. Junction boxes
are commonly installed at different depths in the ceiling,
so we have designed the mounting bracket and ceiling
canopy to allow for this.
STEP 5. BLADE AND BLADE ARM ASSEMBLY
• This fan is supplied with a reversible blade finish.
Choose the blade finish that you prefer and attach as
follow:
• Attach each fan blade to a blade arm with three washer
head screws and three screw pads (see figure 14). Each
screw is passed through the screw pad, then the blade
and screwed into the blade arm.
• Screws should be tightened until the screw pads are
compressed. Hold the blade arm decorative side down
and place the blade on top with your choice of finish
facing down.
FIG. 13
FIG. 14
ENGLISH

Publicité

loading