Preparation Of The Compressor To Start Operation; Compressor Unpacking; Checkup - Prebena VITAS 45 Notice Originale

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparation of the compressor to start operation

Preparation of the compressor to start operation

Compressor unpacking

Compressor unpacking is carried out by two workers.
Do not allow children to play with the packaging film, there is a danger of
suffocation.
 Do not allow children to play with the packaging film.
 Packing material keep out of children's reach.
Save the packing material.

Checkup

Risk of accidents by using faulty compressor.
 Check condition of the compressor before each use.
 Make sure that the compressor is in perfect condition.
 In particular check the following:
If the safety valve is faultless?
If the air filter is set on the cylinder head?
If the oil level is enough?
If the connection to power supply is in order?

Scratches on the casing are not a failure.
 Do not connect faulty compressor to the power supply.
 Before starting the operation of the compressor refer to employees of company PREBENA so they carry
out the repair.
Damaged pressure lines can be broken, it lead to injury.
 Before connecting check the compressor and pressure lines on damages.
ATTENTION!
Damaged pressure lines can be broken and the stream of compressed air-out can inflict property
damage.
 Before connecting check the compressor and pressure lines on damages.
10
WARNING
WARNING
CAUTION
 Place the box in front of you.
Open the top cover of the box.
 Hold tight the box by carrying holes (1).
 Carefully remove the compressor
from package (2) and place it in front of you.
 Remove all packaging material
from compressor.

Publicité

Table des Matières
loading

Table des Matières