Compressor Proof; Maintenance Intervals - Prebena VITAS 45 Notice Originale

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Maintenance of compressor

Compressor proof

The prototype test was made for this compressor or this is not required if before the commissioning an expert
monitoring is not required. We recommend checking receiver under pressure, depending on the load of
compressor, after 10 operating years, with the assistance of a qualified worker. A qualified worker is compe-
tent to carry out works in accordance with the Regulation on Safety at Work place (formerly - the competent
specialist). Please refer to our authorized partners providing the services. They can provide workers who
have passed the expert examination.
These requirements apply only to the Federal Republic of Germany. The relevant national guide-
lines are applicable for all other countries. The supplied documentation (= documents for admis-
sion) is needed to be kept during the whole period of the receiver life.

Maintenance intervals

Service work
Drain the condensate water from the high pressure
receiver
Clean the air filter
General cleaning of compressor
Check the operation of reverse pneumatic valve
18
Every week
Every month
X
X
Every 6 month
Every two years
X
X

Publicité

Table des Matières
loading

Table des Matières