15
Make sure that the condensation water is drained quickly. Keep
the condensation drain clean and remove obstacles that can
prevent normal drainage.
Position the drain pipes without mechanical stress on the drain
connection of the unit.
17
Mount the valve cover plate.
19
Place the screed floor and finish. Remove the cover plate.
JAGA N.V. | CLIMA CANAL H19 | MANUEL | 2021.02.23 | V.01
16
The condensate drain system must be set up with an adequate
p-trap in order to prevent the infiltration of odours. Always install
a plug for cleaning in the lower part of the p-trap in order to allow
quick disassembly.Pour water into the condensate collection pan
and check if the liquid is drained properly. Otherwise, check the
inclination and look for possible blockages.
18
Cover the casing with the protective cover.
20
Install the grille.
3 cm/m
EN
65