1. Connect the Power Cord
Line voltage switch and fuse are set at
factory for country of destination.
3. Connect the Test Leads to the Input Terminals
12A
Fused
500Vpk
1.25A/500V FH
12A
Fused
12A
rms
500Vpk
1.25A/500V FH
4
+
V
HI
AC or DC Voltage , Capacitance, Continuity , Diode Test ,
12A
1000VDC
rms
Frequency, Resistance, or Temperature Measurements
750VAC
-
LO
1.2A
rms
I
CAT II (300V)
V
HI
1000VDC
-
750VAC
LO
AC or DC
1.2A
Current Up
rms
to 1.2A rms
I
+
CAT II (300 V)
2. Adjust the Carrying Handle
Grasp the handle by the
sides and pull outward :
Then adjust the handle
to the desired position :
12A
Fused
12A
rms
500Vpk
1.25A/500V FH
+
V
HI
AC or DC
Current Up
1000VDC
750VAC
to 12A rms
-
LO
1.2A
rms
I
CAT II (300 V)
34405A Quick Start Guide