Installation & Loading Instructions - MPG115MD Stax Pro2
12
12
tions - MPG115MD Stax Pro2
ace the strap loops parallel to the carriers
th the front strap loop on the windshield
d the rear strap loop on the back of the
hicle. See image 12. Note: If only one
The 'second' kayak will be rotated upwards
. Place the 1st kayak onto the foam
into position on its side and secured first. See
yak will be transported, route the free end
blocks and against the carriers. Place
Image 13
the loops over the kayak. Dress the
each load strap under the cross bar (behind
This rotational action serves to pull the straps
free ends of the straps under the
e carrier) prior to placing the loop in image
loops up and into position under the Head of
cross bar and back up and through the
the carrier. See image 13A
. This will engage the cross bar providing
buckles. Pull down to tighten.
ore strength to the installation.
See image 13.
14
13
14
The 'first' boat is now rotated upwards into
. Repeat steps 11-14 for loading the
position. Again, this process naturally pulls
second kayak. See image 15.
the second set of loops up and under the first
nfirm that the kayak is evenly seated on
set of already tightened straps. Repeat steps
12-14 to secure the 'first' boat. See image 15.
e foam blocks and securely strapped to
e carriers. See image 14.
MALONE
R
TM
13A
MALONE
Installation & Loading Instructions - MPG115MD Stax Pro2
. Place the strap loops parallel to the carriers
12
with the front strap loop on the windshield
and the rear strap loop on the back of the
vehicle. See image 12. Note: If only one
kayak will be transported, route the free end
of each load strap under the cross bar (behind
the carrier) prior to placing the loop in image
12. This will engage the cross bar providing
more strength to the installation.
. Place the 1st kayak onto the foam
blocks and against the carriers. Place
the loops over the kayak. Dress the
free ends of the straps under the
cross bar and back up and through the
buckles. Pull down to tighten.
See image 13.
14
. Confirm that the kayak is evenly seated on
the foam blocks and securely strapped to
the carriers. See image 14.
. Repeat steps 11-14 for loading the
second kayak. See image 15.
Holding the buckle in one hand, and the free end in
. Place the strap loops parallel to the carriers
the other, toss or flip the 'loop' over the kayak and
with the front strap loop on the windshield
around the front Stax post. See image 12. Repeat
and the rear strap loop on the back of the
vehicle. See image 12. Note: If only one
for rear Stax, and then the second kayak. See image
kayak will be transported, route the free end
12A
12A
of each load strap under the cross bar (behind
the carrier) prior to placing the loop in image
12. This will engage the cross bar providing
more strength to the installation.
13
13
R
TM
The boat can then be fully tightened down by
. Confirm that the kayak is evenly seated on
passing the free end under the crossbar and back
the foam blocks and securely strapped to
the carriers. See image 14.
up through the buckles.Pull down to tighen. Confirm
13
that the kayak is evenly seated on the foam blocks
and securely strapped to the carrier(s). Repeat for
rear load strap. See image 14
15
15
15
R
TM