Télécharger Imprimer la page

MALONE Stax Pro2 Instructions D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

Stax Pro2 Kayak Carrier
Red Load Straps
Stax Pro2 Kayak Carrier
Red Load Straps
StaxPro2 Carriers
Load Straps (4)
Installation & Loading Instructions - Please Read Before Beginning
Installation & Loading Instructions - Please Read Before Beginning
1
1
Cogs
Cogs
Cogs
1
. Insert a 100mm bolt into the square
hole located in the top of the base.
. Insert a 100mm bolt into the square
See image 2.
hole located in the top of the base.
See image 2.
3
3
3
MALONE
MALONE
S
TA
X
S
TA
X
TWO KAYAK VERTICAL FOLD-DOWN CARRIER
TWO KAYAK VERTICAL FOLD-DOWN CARRIER
60mm
Stax Pro2 Kayak Carrier
Installation & Loading Instructions - Please Read Before B
Jawz Adapters
Jawz Adapters
1
50mm
Cogs
. Insert a 100mm bolt into the square
hole located in the top of the base.
See image 2.
3
S
TA
P
TWO KAYAK VERTICAL FOLD-DOWN CARRIER
2
TM
R
O
P
2
R
O
TM
TM
TM
Blue Safety Strap
50mm
Red Load Straps
Jawz Adapters
50mm
40mm
40mm
Mounting Bolts
Foam Blocks
60mm
Mounting Bolts
Jawz Brackets
Foam Blocks
Step 1: Assembling the Stax Pro2
Step 1: Assembling the Stax Pro2
. Insert the bottom of the post into the
top of the base. Position so the cogs
. Insert the bottom of the post into the
on the post are in contact with the
top of the base. Position so the cogs
cogs on the base. See image 1.
on the post are in contact with the
cogs on the base. See image 1.
2
2
2
. With the holes in the base and post aligned,
push the bolt through the two assemblies
. With the holes in the base and post aligned,
until the end of the bolt is exposed.
push the bolt through the two assemblies
Note: Confirm that the head of the bolt is
until the end of the bolt is exposed.
fully seated into the base. See image 3.
Note: Confirm that the head of the bolt is
fully seated into the base. See image 3.
P
X
R
O
R
R
50mm
40mm
Mounting Bolts
9' Safety Strap
12' Tie-Downs
9' Safety Strap
12' Tie-Downs
Step 1: Assembling the
Safety Tie-Downs
T-Knobs
. Insert the bottom of the
TM
top of the base. Position
TM
on the post are in contac
cogs on the base. See im
2
. With the holes in the base
push the bolt through the
until the end of the bolt
Note: Confirm that the h
fully seated into the base
R
2
TM
TM
Foam Blocks
9'

Publicité

loading

Ce manuel est également adapté pour:

Mpg115