Focal Sib Manuel Utilisateur page 2

Masquer les pouces Voir aussi pour Sib:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2
B - Wall fixing
1. Before drilling any holes, check carefully that there are no electrical cables or pipes in
the wall.
2. Use the hexagonal key supplied in the base
of the Sib to unscrew the bolt that holds the
base to the support bracket
3. Connecting Sib : see section "connections"
page 4.
Feed the cable through the base piece as
indicated in the diagram.
Leave around 10cm of free cable to facilitate
connection.
4. Use the base as a template to mark the
position of the three fixing screws on the
wall. The three fixing holes should be drilled
with a 6mm masonry bit and the plastic wall
plugs firmly inserted until they are flush with
the wall surface.
Fix the base with the three screws supplied.
All manuals and user guides at all-guides.com
Sib User Manual

Publicité

Table des Matières
loading

Table des Matières