Product Information
– Always keep these instructions together with the product even when given to other persons.
– Review the MSDS before use.
– Check expiration date: See imprint on foil pack manifold (month/year). Do not use expired product.
– Foil pack temperature during usage: 0 °C to 40 °C / 32 °F to 104 °F.
– Base material temperature at time of installation: between -10 °C and 40 °C / 14 °F and 104 °F.
– Conditions for transport and storage: Keep in a cool, dry and dark place between
5 °C and 25 °C / 41 °F and 77 °F.
– For any application not covered by this document / beyond values speciied, please contact Hilti.
– Partly used foil packs must remain in the cassette and has to be used within 4 weeks. Leave the mixer atta-
ched on the foil pack manifold and store within the cassette under the recommended storage conditions. If
reused, attach a new mixer and discard the initial quantity of anchor adhesive.
NOTICE
Improper handling may cause mortar splashes.
– Always wear eye protection, gloves and protective clothes during installation.
– Never start dispensing without a mixer properly screwed on.
– Attach a new mixer prior to dispensing a new foil pack (ensure snug it).
– Use only the type of mixer (HIT-RE-M) supplied with the adhesive. Do not modify the mixer in any
way.
– Never use damaged foil packs and/or damaged or unclean foil pack holders (cassettes).
Poor load values / potential failure of fastening points due to inadequate borehole cleaning.
– Hilti hollow drill bits TE-CD, TE-YD must be used in conjunction with a properly maintained Hilti
vacuum cleaner with model and suction capacity (volumetric low rate) as speciied in the acces-
sory table.
– Holes should be drilled with a rotary hammer drill, using drill bits that comply with ANSI
B212.15-1984.
– The boreholes must be free of debris, dust, water, ice, oil, grease and other contaminants prior to
adhesive injection.
– For blowing out the borehole – blow out with oil free air until return air stream is free of noticeable
dust.
– For brushing the borehole – only use speciied wire brush. The brush must resist insertion into the
borehole – if not the brush is too small and must be replaced.
– Before inserting anchor/rebar into borehole, mark and set anchor/rebar to the required embedment
depth.
– Anchor rods/rebar shall be free of dirt, grease, oil, and other contaminants.
Ensure that boreholes are illed from the back of the borehole without forming air voids.
– The annular gap between the anchor/rebar and the borehole shall be illed completely with no gaps.
– If necessary use the accessories / extensions to reach the back of the borehole.
– For overhead applications use the overhead accessories HIT-SZ and take special care when
inserting the fastening element. Excess adhesive may be forced out of the borehole. Make sure that
no mortar drips onto the installer.
Not adhering to these setting instructions can result in failure of fastening points!
Printed: 14.05.2018 | Doc-Nr: PUB / 5157157 / 000 / 05
Hilti HIT-HY 100
en
21