Rough Framing - Before Appliance Installation - Napoleon DYNAMIC HEAT CONTROL Manuel D'installation

Masquer les pouces Voir aussi pour DYNAMIC HEAT CONTROL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.0 rough framing - before appliance installation

Before framing your appliance, determine vent requirements before deciding the fi nal location of the appliance.
After rough framing, place the appliance in its fi nal position. Also, see appliance manual for vent shield installation,
nailing tabs installation,electrical installation, gas installation, etc.
note:
The Elevation series requires a minimum enclosure height (as illustrated), measured from the bottom of the ap-
pliance. For temperature requirements, this area must be left unobstructed. Some venting confi gurations that
require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent
pipes and combustibles.
Ref
B
C
D
L
fi nish framing - after appliance installation
72"
L
(182.8cm)
min.
D
B
EX36
42 3/4"
D
EX42
48 3/4"
22 1/4"
6"
72"
EN
C
17
W415-2753 / 10.23.19

Publicité

Chapitres

Table des Matières
loading

Table des Matières