6.0 minimum clearance to combustible enclosures
minimum clearance to combustible enclosures
EN
1" [25mm] minimum all sides for vertical venting sections.
When passing through a ceiling, use firestop
W500-0028 (not supplied).
(182.8cm)
* Refer to "venting requirements" and "venting installation" sections.
** Clearances within the enclosure may be higher (refer to "minimum framing dimensions" section).
A
G
Horizontal vent sections: A minimum clearance of 3" (76mm) on the top of the vent to combustibles and 2"
(51mm) on the sides and bottom of the vent to combustibles is required.
Vertical vent sections: A minimum clearance of 1" (25mm) all around the vent pipe on all vertical runs to com-
bustibles is required.
note:
The Elevation series requires a minimum inside enclosure height (as illustrated) measured from the bottom of
the appliance. For temperature requirements, this area must be left unobstructed. Some venting confi gurations
that require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent
pipes and combustibles.
16
W415-2753 / 10.23.19
Insulated
sleeve
Dynamic Heat
Control™ air
outlet opening
10 1/4"
72"
min.
G
EX36
59"
33 1/8"
Combustible
Non-combustible
Brick
0" [0mm] if non-combustible
finishing material is used
such as brick and stone.
3"
[76mm]
to top
4"
min.
2"
[51mm] to
sides / bottom
Firestop
assembly
1" [25mm]
EX42
37 1/8"
A
+ rise
63"