Télécharger Imprimer la page
Emerson ASCO 290 Serie Instructions De Mise En Service Et D'entretien
Emerson ASCO 290 Serie Instructions De Mise En Service Et D'entretien

Emerson ASCO 290 Serie Instructions De Mise En Service Et D'entretien

Masquer les pouces Voir aussi pour ASCO 290 Serie:

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

X29050914900200 (NPT 3/4") / X29050914900100 (G 3/4") / 29060066 (G 3/4")
This valve is designed for use in on/off function in a con-
trol loop. In the system, it must be associated to safety
equipment normally used in this kind of process. Its failure
can in no way be held responsible for the effects of any
deterioration or interruption of the process.
DESCRIPTION
Series 290 pressure-operated poppet valves, 2/2 NC, have
been optimised for high flow rates. The valves are equipped
with a piston-type dia. 50 mm operator.The valve body is made
of nickel-plated brass. The seals are made of NBR.
FUNCTION
!
See the corresponding technical leaflet for min./max.
pilot pressures, the operating pressure differential and
the fluid temperature.
PUTTING INTO OPERATION
The valves are intended to be operated within the technical
characteristics specified on the nameplate. Modifications to
the equipment may only be made after consulting the manu-
facturer or his representative. Before installation, depressurise
the piping system and clean internally.
Read all information on the label: code, port, fluid (type, pres-
sure, temperature), pilot fluid, pilot pressure, serial number.
CAUTION: The valves are intended for use with special liquids
(hot water or glycol/water mixtures).
Max. fluid temperature: +60°C
Dia 50 mm operator, piloting with filtered air.
Do not exceed the max. allowable pressure of the valve (8 bar).
Installation and maintenance of the valve must be carried out
by qualified personnel only.
Fitting position
The valves may be mounted in any position. The dia. 50 mm
operator can be rotated by 360° around its axis to enable
easy access to the pilot orifice.
Connection
• The connection (feed or return line, cooling or heating loop)
to the exchanger (Fig. III) is made on the valve body over
the threaded 3/4" port (NPT or GAS).
• The connection of the pilot air supply is made with a right-
angle instant hose fitting 2.7 x 4 mm) (supplied mounted
on the dia. 50 mm operator).
• Use Total CERAN LT grease for mounting.
Installation and Maintenance Instructions
ASCO
Series 290 valves for control in wine tanks
TM
Visit our website at www.emerson.com/asco
MAINTENANCE
Prolonged downtimes
For systems exposed to outdoor climatic conditions (frost),
it is recommended to purge the circuit and valve.
Cleaning
Maintenance of the valves depends on the operating condi-
tions. They should be cleaned at regular intervals. The intervals
between two cleaning operations may vary according to the
nature of the fluid, the working conditions and the environ-
ment in which it is operated. During servicing, the components
must be checked for excessive wear. The components must
be cleaned when a slowing down of the cycle is noticed even
though the pilot pressure is correct or if any unusual noise or
a leak is detected. At worst, this may lead to a malfunction of
the valve and it may not open and close correctly any more.
Sound emission
The exact determination of the sound level can only be car-
ried out by the user having the valve installed in his system.
The emission of sound depends on the application, medium
and type of equipment used.
Preventive maintenance
• Operate the valve at least once prior to putting the system
into operation to check it opens and closes.
• The complete dia. 50 mm operator is available as a spare
part (see replacement procedure of the 50 mm operator).
• If problems arise during maintenance or in case of doubt,
please contact ASCO or one of its authorised representa-
tives.
Troubleshooting
• Incorrect outlet pressure: Check the pressure on the
supply side of the valve; it must correspond to the values
indicated on the nameplate.
Caution: observe the minimum pilot pressure values (see
the corresponding technical specifications).
• Leaks: Disassemble the valve body and clean the internal
parts. Replace, if necessary, the dia. 50 mm operator.
1
EN

Publicité

loading

Sommaire des Matières pour Emerson ASCO 290 Serie

  • Page 1 • The connection of the pilot air supply is made with a right- angle instant hose fitting 2.7 x 4 mm) (supplied mounted on the dia. 50 mm operator). • Use Total CERAN LT grease for mounting. Visit our website at www.emerson.com/asco...
  • Page 2 7. Completely unscrew the gland (ref. 7) with a 36 mm open-ended spanner and remove the operator. 8. If necessary, dismantle the fixed valve (ref. 8) and change the gasket (ref. 9) Seal Kit: X29050914900300 Visit our website at www.emerson.com/asco...
  • Page 3: Fonctionnement

    • Le raccordement de l’alimentation de pilotage est réalisé par un raccord rapide coudé pour tube de 2,7 x 4 mm (livré monté sur la tête Ø 50 mm). • Utiliser de la graisse type Total CERAN LT pour adaptation. Visit our website at www.emerson.com/asco...
  • Page 4 7. Dévisser complètement le presse-étoupe (rep. 7) avec une clé plate de 36 mm et retirer la tête.de commande. 8. Démonter si nécessaire le clapet fixe (rep. 8) et changer la garniture (rep. 9). Pochette de joints : X29050914900300 Visit our website at www.emerson.com/asco...
  • Page 5 X29050914900200 / X29050914900100 Fig. II Fig. I Ref. in.Lb 4.43 0.88 26.55 Description Reference Part Number 4.43 Actuator Kit Fig. II: Ref. 1-10 X29054586000100 70.80 Seal Kit Fig. I: 4 of Ref. 9 X29050914900300 26.55 Visit our website at www.emerson.com/asco...
  • Page 6 DRAWINGS DESSINS Fig. III Exchanger Echangeur ASCO SAS 53 rue de la Beauce, 28110 Luce Visit our website at www.emerson.com/asco 775 729 098 RCS Chartres...

Ce manuel est également adapté pour:

Asco x29050914900200Asco x29050914900100Asco 29060066