Télécharger Imprimer la page

SPALDING Ultimate Hybrid Jr Portable Basketball System Mode D'emploi page 43

Publicité

1.
Use an 11/64 drill bit (6) to pre-drill holes on
backboard (Figure A). A center punch is
recommended to mark hole locations.
A
Using the drilled holes, attach left and right
board pad sections (1 and 2) using screws (7)
and washers (5) as shown.
6
5
7
5
7
B.
Attach middle pad (3) using screws (4) and washers (5) as shown.
BOARD PAD - INSTALLATION
2
1
5
4
1
Center middle pad (3) between left
2.
and right pads (1 and 2) using hash
marks (SEE DETAIL) for given board
A.
size. Slots in middle pad should align
with holes in left and right pad.
1
5
7
1
5
7
HASH MARKS
5
3
43
3
3
BOTTOM VIEW
2
4
2

Publicité

loading