SUPPORT BASE ASSEMBLY ΟΝ ΑΝ INCLINED SURFACE
ATTENTION!
After the installation check that the collectors surface has a tilt angle to the horizontal position of
geographical latitude ±5°.
1.
Unfold the beams.
2.
Orient boiler 2 and collector 1
beams as represented on the
image. Place boiler support 5
on top of boiler beam and fix it
with bolts M8x16.
3.
Screw boiler beam 2 and
collector beam 1 to each
other using bolt M8x50.
4.
Screw vertical 4 beam to
collector 1, boiler 2 and
horizontal 3 beams using
bolt M8x16.
5.
Repeat Step 1- 4 for the
other pair of parts.
All manuals and user guides at all-guides.com
5
2
1
1
2
1
2
3
SIME NATURAL S (vers. LP)
ENG
4
23