GENERAL PREVENTION MEASURES
•
Please respect the instructions related to accidents prevention and the safety rules during the installation of the
solar thermal systems as well as the piping.
•
Please keep the work place clear and free of objects obstructing the execution of works.
•
Do not let children, pets and other people to come in contact with the tools or close to the working place. This has
to be respected, especially in case of existing buildings renovation.
•
Store the antifreeze liquid in a safe place away from children.
•
During the execution of maintenance, service or installation modification works, please remove the electrical
devices and tools current collector or protect the electrical devices and electrical tools against unintended
activation.
•
Use only the tools intended to be used for this specific solar system. The use of other components or inappropriate
tools can cause accidents.
Requirements related to the personnel
•
The installation of our Solar Thermal systems can only be undertaken by authorized specialized companies and
trained personnel.
•
Works in electrical installations or conductors have to be executed by trained & specialized electro technicians
only.
Labour uniforms
•
Have protection glasses on, as well as appropriate work uniform, protection shoes, protection helmet and special
long hair net.
•
Do not wear baggy clothes or jewelry, as they me be trapped in movable parts.
•
If, despite the use of protection glasses, antifreeze liquid comes in contact with your eyes, wash off your eyes with
plenty of water and with the eyes wide open.
•
Please wear protection helmet during the installation works executed at the level of or above the head.
Installation of the water storage tank
•
For the transportation, mounting & installation of the tank use forklifts suitable for the dimension and weight of the
tank.
•
Please protect the enameling surface from beatings during transportation and installation.
•
Due to the tank's weight, there is a risk of accidents. Please make sure that the bearing capacity of the ground
where the tank is going to be installed is adequate, when the tank is full.
LIGHTNING PROTECTION
The metal construction conforms to the general requirements of the ELOT 1197 Standard and the special lightning
protection requirements of the ELOT 1412 Standard which takes into account the environmental conditions as well
as the altitude.
16
SIME NATURAL S (vers. LP)
All manuals and user guides at all-guides.com