Faber ZOOMIS16SS400 Instructions D'installation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONNECTING HOOD-PLATE CABLES
N.B. Before continuing with installation it is
necessary to move the hood to a height of at least
24" from the cooker hob, using a support or the
assistance of another person.
This is essential, as the hood cables must
necessarily be connected to the plate fitted
to the ceiling without the weight of the hood
bearing on the structure.
The cable fixing system is made up of 3 parts:
• Threaded Pawls (a) already mounted on the ceil-
ing plate.
• Cable clamp screws (b) provided (15).
• Safety knobs (c) provided (15).
• Pass the cables connected to the hood canopy
into the respective holes in the plate cover, after
dismantling.
• Insert the cable raceway (14) in the opening on
the plate cover and pass the hood power supply
cable through it.
Warning: Do not break or remove the clamp fix-
ing the power cable to the Hood.
• Attention to the direction of the plate fixed to the
ceiling (the limit pawl on the plate fastened to the
ceiling has a corresponding hole on the plate cover
and on the hood canopy).
11
9
A
B
15
C
10
14
11

Publicité

Table des Matières
loading

Table des Matières