Télécharger Imprimer la page

Valor HORIZON Clearview 645CFV Guide D'installation page 2

Publicité

Les langues disponibles

Les langues disponibles

Installation
Install the heater as per installation instructions
supplied with it.
Finish the wall at sides up to the black frame on heater.
Finish the wall 1 inch (25 mm) above the top of the
black frame on heater. Ensure that the wall fi nish is
fl ush or slightly in front of the black frame. Allow for
height of fi nished hearth or the backing plate will not
install.
If the wall above the heater is fi nished to the black
frame, the wall fi nish must be cut 1 inch (25 mm) to
allow the fi tting of the backing plate.
Alternatively, if the wall fi nish is non-combustible, the
fl ange on the top rear of the backing plate can be
broken off the plate to allow the fi nish behind the plate.
1. Install the backing plate to the heater fi xing it with
4 screws provided. The position of the plate can
be adjusted front to back to accommodate the wall
fi nish thickness.
2. Slide in and place the heat exchanger cover as
indicated. The bottom tabs cover the ports.
Heat Exchanger Cover
2
Heat Exchanger
3. Remove the existing baffl e supplied on the heater
(3 screws). Fix the convection heat baffl e supplied
to the heater (3 screws). You may need to remove
the window to gain space for a screwdriver.
Check the appliance manual for window removal
instructions.
Slide the baffl e in or out so that its fi rst bend lines
up with the front face of the backing plate.
3-Sided
Frame
Convection heat baffl e
position—
right side section view
4. Re-install the window if you have removed it. Follow
the procedure supplied in the appliance manual.
5. Fit the side shrouds to the heater by fi rst sliding
them up beside the convection baffl e and then
hooking the tabs down to the heater frame.
1
2
1
2
Backing Plate
Heat Baffl e
1
2

Publicité

loading