Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Read the enclosed safety instructions,
Erection instructions
1. Rotar : Technical data

2. Flexible shaft

3. Start-up procedures:
3.1
Set the operating speed
3.2
Connect the flexible shaft
3.3
Connect the SAK safety clutch
3.4
Connect toolholders
3.5
Start-up with SAK
4. Accessories: FH15, WH15, SAM, TAM
1. Rotar
F = base plate
STM = trolley mounted
See Fig. A
Machine elements:
A1 On / Off switch
A2 Retention pin
( STAR / DELTA)
A3 Speed indicator
Technical data
Three-phase motor
Type
3,2 kW
Power input / output
Type
2,4 kW
Power input / output
Insulation protection class
Voltage (see spare parts list)
Ground fault protection: Used for tools
with water feed or in humid environments :
No load speeds
6-speed gear box
Sound pressure level CEN/TC 255 N
Flexible shaft connection
For flexible shaft types:
(see catalogue)
Vibration values ISO/DIS 8662-4
Toolholder type:
Test plate:
FH 15
ø100 x 25
WH 15
ø100 x 25
SAM 1:1
ø230 x 6
TAM 1:1
ø100 x 25
Maintenance
• Store machine in a dry, clean place.
• Cooling air ports must be kept free of obstructions.
• Unplug before performing any maintenance work.
• Change gear grease every 12 months. Your SUHNER Service Centre
can perform this work quickly and efficiently.
• Check connecting cables regularly. Damaged cables must be replaced
under all circumstances.
• Repairs may only be performed by a qualified electrician Accidents
could otherwise occur for the operator.
• Complaints can only be accepted if the machine is returned unopened.
2. Flexible shaft
See Fig. B
Machine elements:
B1 threaded coupling (DIN15=M14)
B2 casing coupler
(DIN15=ø40)
B3 Spring-loaded pin
Type: NA15 DIN 15/G35, permissible operating speed
Type: NA12 DIN 15/G35, permissible operating speed
appendix 39 230 ..!
appendix 39 328 ..!
HM = hanging attachment
A4 Speeds
A5 Excenter
A6 Motor shaft
3'200 / 2'700
2'400 / 2'100
IP44
Various
45 V
50 Hz
60 Hz
13' 500
16' 200
7' 300
8' 700
5' 100
6' 100
2' 700
3' 200
1' 700
2' 000
1' 000
1' 200
77
80 dB (A)
DIN 15 =M14
see A6
NA 15 DIN 15 / G35
see B2 B8
NA 12 DIN 15 / G35
Measured value: Excenter stage:
2
< 2,5 m/s
8' 700
< 2,5 m/s
2
5' 100
2
< 2,5 m/s
6' 100
2
< 2,5 m/s
6' 100
B4 Casing
B5 Core
B6 Driving pin
B7 Spring-loaded pin
B8 casing coupler G35
8'000 RPM
12,000 RPM
Maintenance
• Store flexible shaft in a dry, clean place.
• If used daily: Re-grease once monthly. Remove core B5 from casing
B4. Remove shaft grease. Lightly apply SUHNER shaft grease to core
B5.
Order No. for 1 kg can : 904 832.
• New shafts or newly greased shafts require running-in.
GB
• Clean casing coupler B2 B8 before use. Worn casing couplers lead to
increased vibration and noise. The casing B4 must then be replaced
(see spare parts list).
3.
Set the operating speed
1
See Fig. A
• Only change speed when machine is switched off. A1 Wait until gears
are completely motionless. Unplug power supply.
• Ensure that the desired speed A4 is permissible for the tool and
toolholder used.
1. Remove retention pin A2.
2. Turn excenter A5 clockwise until it reaches the limit stop. Release
retention pin A2. All speeds must be visible in this position.
3. Move excenter A5 axially until the correct
4. operating speed A4 is positioned in the speed indicator A3.
5. Turn excenter A5 all the way to the left.
6. Retention pin A2 must click audibly into place.
7. Ensure that the correct operating speed is positioned directly and
centrally in the speed indicator A3. If the retention pin does not click
into place, or the selected speed is not displayed in the center, the
procedure must be repeated from Step 1 .
• Attention : In case the machine is operated in one gear position only -
one must at least once a week switch through all positions for a brief
W
period in order to redistribute the grease for long gear service life.
W
(run without flex.Shaft and handpiece)
3.
Connect the flexible shaft
2
See Figs. A + B
1. Insert pin in retention hole.
2. Slightly withdraw threaded coupling B1 from casing coupler B2.
RPM
3. Insert second pin through transverse hole in threaded coupling B1 and
4. Fasten tightly onto the motor shaft A6.
5. Remove pins.
6. Insert casing coupler B2 completely into excenter hole A5.
7. Depress spring-loaded pin B3 and completely insert casing coupler B2.
8. Spring-loaded pin B3 must click audibly into place in the retention hole.
Ensure that spring-loaded pin B3 has locked firmly into place. If
necessary, move/rotate casing coupler B2 until spring-loaded pin B3
clicks into place.
3.
Connect the SAK safety clutch
3
See Fig. C
Machine elements:
C1 Retention hole
RPM
C2 Safety lever
RPM
RPM
Use the Type SAK G35 safety clutch to protect operator from accidental
RPM
start-up.
1. Insert casing coupler B8 into tool connection.
2. Depress spring-loaded pin B7 and completely insert casing
coupler B8.
3. Spring-loaded pin B7 must click audibly into place in retention hole C1.
Ensure that spring-loaded pin B7 has locked firmly into place. If
necessary, move/rotate casing coupler B8 until spring-loaded pin B7
clicks into place.
3.
Connect toolholders
4
See Fig. C
The connection of toolholders corresponds to the procedure described
in Item 3.3.
Note: Toolholders SAM and TAM can be rotated on the casing coupler
for easier handling.
3.
Start-up with SAK safety clutch ( deadman switch)
5
See Fig. D
• Attention : The powerfull machine develops a heavy torque when
switched-on. Thus secure yourself in a rigid position and
hold on to the handpiece.
• This machine has a dual start up switch to protect system from
(Excenter switch)
to the motor
(accessory)
C3 Locking pin
C5 Driving pin
C4 Spring-loaded pin

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

HmF

Table des Matières