Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
accordance with local codes.
Screw legs into the permanently fastened nuts on the four corners of the unit and tighten by hand. Level
the unit by turning the adjustment screw at the bottom of each leg. Do not slide unit with legs mounted, lift if
necessary to move unit.
Pipe threading compound must be resistant to the action of liquefied petroleum gases.
Caution: DO NOT use an open flame to check for leaks. Check all gas piping for leaks with a soap and
water solution before operating unit.
THESE UNITS ARE SUITABLE FOR INSTALLATION ON NON-COMBUSTIBLE
SURFACES ONLY.
Combustible clearances:
6" sides (152 mm)
6" rear (152 mm)
4" floor (102 mm)
Noncombustible clearances:
0" sides (0 mm)
0" rear (0 mm)
4" floor (102 mm)
Do not obstruct the flow of combustion and ventilation air, under the unit by the legs or behind the unit by the
flue.
Adequate clearance for air openings into the combustion chamber is required. Do not place objects between
the bottom of the unit and the counter top.
There must be adequate clearance for removal of the front panel. All major parts except the burners are
removable thru the front if the gas line is disconnected.

Operation

LIGHTING INSTRUCTIONS
Lighting pilot:
The pilot light on the appliance has been set at the factory. A screwdriver maybe required for the first lighting to
adjust the flame for your elevation.
1. Turn off the manual valve and wait 5 minutes to clear the gas.
2. Turn all knobs to the "OFF" position.
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ce-cn-hp424mCe-cn-hp636m437334373443735

Table des Matières