Pre-Installation Checklist - Monogram ZGU384N Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PRE-INSTALLATION CHECKLIST

1. When preparing cooktop opening, make sure
the inside of the cabinet and the cooktop do
not interfere with each other. (See section on
preparing the opening.)
2. Slide the cooktop out of the end of the box.
Remove packaging materials, grate boxes,
regulator and literature package from the
cooktop before beginning installation.
• Use the shipping carton as a pad to protect
customer countertops or flooring.
Foam support
Packaging containing
left and right side grates
Regulator taped
to the underside
Packaging containing
left and right side grates
Installation Preparation
3. Remove Installation Instructions from literature
4. Make sure you have all the tools and materials
5. Your home must provide the adequate electrical
6. When installing your cooktop in your home, make
7. Make sure the wall coverings, countertop and
Foam packaging
6
package and read them carefully before you
begin.
Be sure to place all literature, Owner's Manual,
Installations, etc. in a safe place for future
reference.
you need before starting the installation of the
cooktop.
service needed to safely and properly use your
cooktop. (Refer to section on electrical
requirements.)
sure all local codes and ordinances are followed
exactly as stated.
cabinets around the cooktop can withstand heat
(up to 200°F) generated by the cooktop.

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zgu384l

Table des Matières