Forno FFSGS6275-30 Guide D'installation page 22

Masquer les pouces Voir aussi pour FFSGS6275-30:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Leakage testing of the range shall be conducted according to the installation instructions provided with the range.
Before operating the range after the gas conversion, always check for leaks with a soapy water solution or other
acceptable method at gas connections installed between the gas inlet pipe of the range, gas regulator, and the manual
shut-off valve.
WARNING
WARNING
Otherwise, the thermocouple may not touch the small flame at the minimum level, which will cause the flame out
accidentally.
STEP 6: Installation of LPG Conversion Label
Record the model and serial number on the LP / Propane Conversion Label provided in this kit.
The information can be obtained from the existing Rating / Serial label. Place the LPG conversion label as close as possible
to the existing Rating / Serial label on the range.
STEP 7: Gas Valve Adjustment (Optional operation)
If the oven burner flame is too big or too small, adjusting gas inlet orifice on the oven valve can be conducted to
correct the flame size. Follow the instructions in this section.
WARNING
Need to re-adjust the orifice in case this is happened.
DO NOT use a flame to check for gas leakage.
Please make sure the thermocouple within 2-2.5mm far away from the oven burner.
If the orifice is adjusted to be too small, the oven burner flame might be off during normal use.
Oven control
20

Publicité

Table des Matières
loading

Table des Matières