Chamberlain C205C Manuel Du Propriétaire page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
STEP 1 Determine the header bracket location
To prevent possible SERIOUS INJURY or DEATH:
Header bracket MUST be RIGIDLY fastened to structural support on header wall or ceiling, otherwise
l
garage door might NOT reverse when required. DO NOT install header bracket over drywall.
Concrete anchors MUST be used if mounting header bracket or 2x4 into masonry.
l
NEVER try to loosen, move or adjust garage door, springs, cables, pulleys, brackets, or their hardware, ALL
l
of which are under EXTREME tension.
ALWAYS call a trained door systems technician if garage door binds, sticks, or is out of balance. An
l
unbalanced garage door might NOT reverse when required.
Installation procedures vary according to garage door types. Follow the instructions which apply to your door.
1.
Close the door and mark the inside vertical centerline of the garage door.
2.
Extend the line onto the header wall above the door.You can fasten the header bracket within 4 feet (1.22 m)
of the left or right of the door center only if a torsion spring or center bearing plate is in the way; or you can
attach it to the ceiling (see page 13) when clearance is minimal. (It may be mounted on the wall upside
down if necessary, to gain approximately 1/2" (1 cm). If you need to install the header bracket on a 2x4 (on
wall or ceiling), use lag screws (not provided) to securely fasten the 2x4 to structural supports as shown
here and on page 13.
3.
Open your door to the highest point of travel as shown. Draw an intersecting horizontal line on the header
wall 2" (5 cm) above the high point:
2" (5 cm) above the high point for sectional door and one-piece door with track.
l
8" (20 cm) above the high point for one-piece door without track.
l
This height will provide travel clearance for the top edge of the door. NOTE: If the total number of inches exceeds the
height available in your garage, use the maximum height possible, or refer to page 13 for ceiling installation.
Header Wall
Vertical Centerline of Garage Door
Level
(Optional)
Sectional door with curved track
Header Wall
2" (5 cm)
Track
Highest
Point of
Travel
Door
One-piece door without track:
jamb hardware
Header Wall
8" (20 cm)
Door
Highest
Point of
Travel
Jamb
Hardware
12
OPTIONAL CEILING MOUNT
FOR HEADER BRACKET
2x4
Structural
Supports
Unfinished
Ceiling
One-piece door with horizontal track
Header Wall
2" (5 cm)
Door
Track
Highest
Point of
Travel
One-piece door without track:
pivot hardware
Header Wall
Door
2x4
8" (20 cm)
Highest
Point of
Travel
Pivot

Publicité

Chapitres

Table des Matières
loading

Table des Matières