INSTALLATION
Do not unscrew the head (Fig. 1/pos. 2) from the tank (Fig. 1/pos. 6).
Install the shoulder strap and adjust its length, as necessary.
1
PREPARING FOR OPERATION
Check the correct operation of the safety valve before each use of the device.
Carry out the steps described blow, when the tank is filled with water to its nominal capacity – see the table
with technical data.
Always de-pressurize the tank before unscrewing the pump!
To de-pressurize the tank (Fig. 1/pos. 6), pull the head of the safety valve (Fig. 3a/pos. 1) and keep it pulled
for at least 10 seconds, until pressure has been completely released.
1
Fig.3a
Safety valve open
OPERATING INSTRUCTIONS
Fig.2
Fig.3b
Safety valve closed
2
PL
EN
DE
RU
FR
Fig.3c
13