Promax RM-026 Manuel page 21

Logiciel de contrôle pour l'appareil
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

RM-026 PROMAX instruments control software
Once the PC and the instrument are connected through the CC-209 cable, turn on
both equipments and then run the RM-026 software following next steps:
1.- Verify the instrument PROMAX is on.
2.- Check the connection between the instrument and the PC.
3.- Select the PROMAX instrument model to control.
4.- Verify the selected communication port. To do this select the Config menu in
the main bar and click on Communication Port (COM 2 by default).
5.- Check the communication link by pressing, the Receive button from the
Config menu.
If a Communication error message appears:
Repeat the previous steps, changing for example the communication port.
If your PROMAX instrument has a previous software version it will be necessary to
upgrade it to the new version before carrying out any other operation. Previous control
software may not be 100% compatible with RM-026. The updating process lasts for 3
minutes approximately. Before starting the upgrade it is important to verify that the
instrument battery is fully charged and the PROMAX instrument is not in auto-power
off mode, in order it does not turn off during the updating process. Never disconnect
the Cable TV analyser from the serial port before exit completely the RM-026
program.
Under no circumstances PROMAX ELECTRONICA, S.A. is liable for data loss or any
damages that may be caused directly or indirectly by this program. Although we have
done our outmost to develop a program that is both useful and reliable, it is
understood that the use of the program and of the data and information that are
generated with it are the sole responsibility of the user.
11/2006
VERY IMPORTANT REMARK
LEGAL NOTICE
Page 3

Publicité

Table des Matières
loading

Table des Matières