Testing And Initial Start Up - Hestan Cue KRCR24 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FINAL INSTALLATION
PROPER AIR CIRCULATION (KRP)
For KRP models, ventilation is provided by a forced air system through a grill in the
top of the refrigerator. This open space in the grill must not be restricted by any
cover or device that would reduce the proper airflow, as it would reduce product
efficiency and increase energy consumption. A vent must be provided at the rear
for the air to exit. See page 5 for location and dimensions.

TESTING AND INITIAL START UP

PRETEST CHECKLIST
;
Check that the connection to the water system does not have any leaks and that the valve
is easily accessible.
;
Check that the electrical connection is correctly installed and that the circuit breaker is
identified/marked for later use.
;
Check that the unit is level and aligns with adjacent cabinets.
;
Check that the anti-tip brackets are secure, and the side connectors are secure with trim in
place.
;
Check that all adhesive tape and external or internal temporary protective packaging have
been removed.
;
Check the perfect closing of the doors and the smooth sliding of the drawers and shelves.
;
If the unit has an icemaker, make sure the water filter cartridge is installed. (Unless filtered
water is being provided to the unit.)
(CONT.)
2019 Hestan Commercial Corporation
EN
35

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour Hestan Cue KRCR24

Ce manuel est également adapté pour:

Krcl30ovKrcr30Kfcr30

Table des Matières