Télécharger Imprimer la page

GCE ECOSAVER+ Notice D'utilisation page 12

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39
3. COMMENCING OPERATION
3.1 Danger of explosion!
Keep all parts, your hands and tools free of oil and grease.
3.2 These Operating Instructions have to be observed conscientiously before starting
and during operation.
3.3 Check that the pressure control regulator is suitable for the gas being used
EN
(see Markings).
3.4 Check that the cylinder valve connection is clean and undamaged; if not the pressure
control regulator must not be connected.
3.5 Before connecting the pressure control regulator briefly open and close the cylinder valve
(1) in order to remove possible impurities. Do not stand in front of the outlet of the cylinder
valve. Do not hold your hands in front of the cylinder valve outlet.
3.6 Connect the pressure control regulator inlet (2) to the cylinder valve (1) ensuring a gas
tight seal. The safety valve (5) must point downward.
3.7 Connect hose to the connection at the outlet stem (7) and to the downstream equipment.
Use hoses corresponding to EN 559 (ISO 3821) and hose connections corresponding to EN
560; secure by appropriate hose clips or ferrules.
3.8 Setting the Flow rate
Version A (single flow) + Version B (twin flow)
Prior to releasing gas into the system, check the following:
1. Correct version of ECOSAVER+ is used
2. Gauge pointer at zero
3. Pressure adjusting knob (6) fully screwed out (anti-clockwise)
4. Only for version B Control valve (11) must be closed (clockwise)
5. Setting of the required flow:
Version A (single flow)
At first close the adjusting screw (6) (must be free). Open slowly cylinder valve
(1). The inlet gauge (3) is indicating the cylinder pressure. Open adjusting screw
(6) clockwise and set the desired flow.
Version B (twin flow)
At first close the adjusting screw (6) (must be free) and control valve (11) must be closed.
Open slowly cylinder valve (1). The inlet gauge (3) is indicating the cylinder pressure.
Open adjusting screw (6) clockwise and set the desired flow (setting of the flow with gas
saving effect). Slowly open the control valve (11) and set the require flow.
4. TERMINATION OF OPERATION
4.1 Short-time interruption:
For short periods. Unscrew the adjusting knob (6) anticlock wise.
ECOSAVER+ with twin flowmeter unscrew the adjusting knob (6) anticlock wise
and close the valve (11).
4.2 Prolonged interruption:
Close cylinder valve (1); relieve pressure by opening the adjusting knob (6)
and downstream equipment fully.
12/32

Publicité

loading