EN
4.5 - Limit switch fixing
he a e has o be e uipped wi h s op locks a he openin and
closing, which prevent the gate derailment.
he s op lock posi ion mus assure ha he limi swi ch bracke s
don't collide with the pinion gear.
Haul the gate manually at the opening leaving, depending on the
5 - TESTING AND COMMISSIONING THE AUTOMATION SYSTEM
he sys em mus be es ed by a uali ed echnician who mus
perform the tests required by the relevant standards in relation
to the risks present, to check that the installation complies with
5.1 - Testing
All system components must be tested following the procedures
described in their respective operator's manuals;
ensure that the recommendations in Chapter 1 - Safety Warnings -
have been complied with;
check that the gate or door is able to move freely once the automation
system has been released and is well balanced, meaning that it will
remain stationery when released in any position;
5.2 - Commissioning
Once all (and not just some) of the system devices have passed the
testing procedure, the system can be commissioned;
the system's technical dossier must be produced and kept for
10 years. It must contain the electrical wiring diagram, a drawing
or photograph of the system, the analysis of the risks and the
solutions adopted to deal with them, the manufacturer's declaration of
conformity for all connected devices, the operator's manual for
every device and the system maintenance plan;
a da apla e wi h he de ails o
the person who commissioned it, the serial number and year of
construction and the CE marking on the gate or door;
also
a si n speci yin
hand;
16
he au oma ion
he name o
he procedure or releasin
he sys em by
gate weight, a crack from 30 to 50 mm between the main gate and
mechanical stop.
as en he limi swi ch bracke hrou h he dowels
he limi swi ch is pressed
epea he opera ion wi h he main a e a he closin
the relevant regulatory requirements, especially the EN12445
s andard which speci es he es me hods or a e and door au oma ion
systems.
check that all connected devices (photocells, sensitive edges,
emergency buttons, etc.) are operating correctly by performing gate
or door opening, closing and stop tests using the connected control
devices (transmitters, buttons or switches);
perform the impact measurements as required by the EN12445
standard, adjusting the control unit's speed, motor force and
deceleration functions if the measurements do not give the required
results, until the correct setting is obtained.
draw up the declaration of conformity, the instructions and
precautions for use for the end user and the system maintenance
plan and consign them to the end user;
ensure that the user has fully understood how to operate the system
in automatic, manual and emergency modes;
the end user must also be informed in writing about any risks and
hazards still present;
N N
after detecting an obstacle, the gate or door stops
during its opening travel and automatic closure is disabled; to
restart operation, the user must press the control button or use the
transmitter.
so ha
Fig. 10
Fig. 11