Key Automation TURBO 50 Instructions Et Avertissements Pour L'installation Et L'usage page 14

Motoreducteur pour coulissants
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
EN
3 - PRELIMINARY CHECKS
e ore he ins alla ion s ar s we su
inspections and operations:
the gate framework must be strong and suitable;
the gate must not show too many sideways slide skids during the
running;
the system of wheels/lower rail and roller/upper runner must work
without too many frictions;
4 - INSTALLING THE PRODUCT
4.1 - Manual running
Insert the key and turn it 90° in anticlockwise direction.
N
ake care o re en a e he earmo or be ore s ar in i up
4.2 - Installing
espec in
he o erall size
s urdy screw anchors
N
he e ac dimensions o he rack mus be known o allow precise calcula ion o he coun erpla e posi ion
14
es
o carry ou
ollowin
Fig. 2
o round he base pla e hrou h
or drown i in o he concre e
Fig. 3
to avoid the gate derailment you must install the stop beats of the
sliding, whether at the opening or closing, and a second upper
roller/runner in full observance of the current law;
remove any manual lock in the beforehand gates;
take on the gate bottom the feed raceway of the feeding cables
mm and o e ernal connec ion pho ocell
selector, etc...).
Pull the knob till it is perpendicular to the gearmotor.
n a in wi h he mo or runnin may dama e i s in ernal componen s
Plan for one or more sheathing for the passage of the power lines.
ash li h key
Fig. 4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Turbo 80Turbo 120Turbo 160

Table des Matières