Télécharger Imprimer la page

oventrop Regumat Instructions D'installation page 9

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
Application:
Hot water central heating systems PN 10, max. flow temperature 100 °C
The Oventrop boiler connection system "Regumat" allows an economical and time-saving connection of the
boiler to the pipework.
The individual components of the Regumat are supplied loosely connected. The connection has to be tightened
after installation of the pump.
The circulation pump and the tailpipe sets are to be ordered separately. The connection box of the pump must
be on the left hand side of the actuator (9 o'clock position).
The insulation shells are part of the packaging. When leaving the factory, the supply pipe is on the right hand
side.
"Regumat M3"
"Regumat M4"
"Regumat S"
Installation of the supply pipe of the Regumat S, M3 and M 4 on the left hand side is carried out as follows:
Unscrew flanged pipe with check valve on the return (left hand side of the Regumat) and screw it back on the
right hand side. Install pump on the left hand side.
The switching box of the pump must be on the right hand side of the actuator (3 o'clock position). Pull out and
interchange the red and blue plugs on the front of the insulation. Red = Supply, Blue = Return
A modification to the mixing valve is not required.
9

Publicité

loading