IMPORTANT:
Always maintain 36-3/4" minimum height from the floor to the cutout in any single or combined
installation.
PREPARE THE OPENING
The Advantium 240V can be installed in combination
with other Monogram Built-In appliances. Always
follow each product's Installation Instructions to
complete the installation.
Single Advantium 240V Installation:
Order a 30" wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
30"
17-1/2"
36-3/4"
Min.
• Always maintain 36-3/4" minimum height from the floor
to the cutout in any single or combined installation.
• Allow the following clearances around the cutout on the
front surface of the cabinet : 1−7/8 " from the top, 2−3/8"
from the side edges, and 1−1/8" from the bottom. (Note:
these refer to minimum clearances required for installation
and do not reflect actual product dimensions.)
• Oven overlaps will conceal cut edges on all sides of
the opening.
When installed over a single oven or a warming
drawer, allow at least 2" between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 240V and the other
appliance overlaps.
Construct a solid oven floor of 3/8" min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
• The support must be level and rigidly mounted, flush
with the bottom edge of the cutout.
31-7000080 Rev.1
Standard Installation Preparation
23-1/2"
25-1/4"
Construct
Base
Min. 3/8"
Plywood
Supported
by 2x4
or 2x2
Runners all
Four Sides
PREPARE THE OPENING
Installation over a Warming Drawer:
30"
25-1/4"
17-1/2"
36-3/4"
Min.
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
(CONT.)
23-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported
by 2x4 or 2x2
Runners all
Four Sides
2" Min.
(3"
recommended)
Per warming
drawer
requirement
5