Unpacking
• Begin by placing the package on a covered flat surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
• Verify all the contents in the box and gather the required tools. See "Parts" and "Tools Needed" in the list below.
Parts Supplied
Lock Nut
(1/4")
Washer (1/4")
Hex Bolt
(1/4" dia x 3/4")
2
Description
1.5" x 1.5" x 6" Ceiling Mounting Angle
1.5" x 1.5" x 18" Vertical Angle Posts
1.5" x 1.5" x 27" Vertical Angle Posts
1" x 2.75" x 48" Short Perimeter Beam
1" x 2.75" x 51" Long Perimeter Beam A
1" x 2.75" x 51" Long Perimeter Beam B
47" Cross Supports
Center Support Beam
Steel Grid Platforms
Steel Grid Platforms with Notched Corners
Hardware Box
1/4" Diameter x 3/4" Long Bolts
1/4" Nylon Lock Nut
1/4" Diameter x 3" Long Lag Bolt
1/4" Washers
Lag Bolt (1/4"dia x 3")
Steel Grid Platforms
Vertical Angle Posts
Quantity
Center
Support Beam
Cross
Supports
Short
Perimeter Beam
Ceiling
Long Perimeter
Mounting
Beams (A+B)
Angle
4
4
4
2
2
2
6
1
2
2
1
24
24
8
56