Bolt the Center Support into the holes found
in the middle of the 6' or 8' assembly. Use two
17
1/4" x 3/4" bolts and 1/4" lock nuts with four
1/4" washers per side.
Place both wire grids with notched corners on
the ends of the VersaRac. Notched corners should
19
provide clearance for the Vertical Angle Supports.
Warning:
Periodically (at least quarterly) inspect your VersaRac unit to ensure beams are seated properly and
brackets are firmly connected to the overhead supports. If there is no sufficient structure, remove
the overhead and install the ceiling mounting angles into proper ceiling support.
Place the cross supports into the slots on
18
the top of the long cross beam assemblies.
Place one wire grid between the previously
20
installed grids if installing a 6' VersaRac, or 2
if it is an 8' VersaRac.
Note:
If installing 6' VersaRac you will have one grid section left over.
Note:
If installing 6' VersaRac you will
have two cross supports left over.
11