Télécharger Imprimer la page
Napoleon PF1 Instructions D'installation
Napoleon PF1 Instructions D'installation

Napoleon PF1 Instructions D'installation

Module d'opération de synchronisation

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

Auxiliary Timing Operation Module (ATOM) Installation Instructions
WARNING
!
Ensure the Auxiliary Timing Operation Module (ATOM) is operational after installation. The pilot will turn off then
back on again approximately one minute after it is activated.
note:
If your fi replace is equipped with a Bluebooth control (eFire), please disconnect the Bluetooth module from the SIT
board before using the ATOM. The Bluetooth module is currently not compatible with the ATOM. If you have used the
Bluetooth and would like to use the ATOM system in order to keep the pilot operating continuously, you MUST fi rst
disconnect the Bluetooth module, turn your fi replace on and off with your appliance's handheld remote, then use the
remote to turn on the CPI, and fi nish by switching the ATOM system to "on".
Use only high quality alkaline batteries. If the appliance is not being used for an extended period of time, we
recommend removing the batteries to protect against possible leakage.
1.
Ensure ATOM toggle switch is set to the OFF position and the appliance is unplugged.
2.
Open ATOM lid and install 2 x AAA alkaline batteries (not supplied), then close and resecure lid. Ensure the
batteries are installed with positive (+) and negative (-) in the correct orientation.
3.
PF1 Basic: Cut the blue wire going from the control board to the IPI/CPI switch.
PF2 Basic (no remote): Cut either of the blue wires going to the IPI/CPI switch.
PF2 Advanced (remote): Cut the looped blue wire marked IPI/CPI.
4.
Connect the red ATOM wires to the two ends of the blue wire cut in the previous step. Use the wire connectors
provided.
5.
Use the velcro provided to locate the ATOM in a similar location to the control board and ensure that it is not
in direct contact with the fi rebox of the appliance. Do not stack on other components. Ensure all wires are
routed away from the fi rebox. Wires cannot come in contact with the fi rebox.
6.
Plug in the appliance and set the pilot to CPI mode. Ensure appliance is functioning correctly.
7.
Slide the ATOM toggle switch to the ON position when it is desirable to run the pilot continuously beyond 7 days
(where acceptable).
PF1 Basic
W190-0175
DIGITAL
FIREPLACE
BURNER
CONTROL
PF2 Basic
W190-0176
LAMP
COMFORT
FAN
W190-0197
CPI SWITCH REQUIRED
FOR USE OF ATOM
W750-0191
ON/OFF
CPI SWITCH REQUIRED
FOR USE OF ATOM
W750-0191
W190-0197
PF2 Advanced
W190-0177
LAMP
COMFORT
FAN
W190-0197
W415-2853 / D / 06.04.20

Publicité

loading

Sommaire des Matières pour Napoleon PF1

  • Page 1 (+) and negative (-) in the correct orientation. PF1 Basic: Cut the blue wire going from the control board to the IPI/CPI switch. PF2 Basic (no remote): Cut either of the blue wires going to the IPI/CPI switch.
  • Page 2 Assurez que les piles sont installés avec le positif (+) et négative (-) dans l’orientation propre. PF1 Basique: Coupez le fi l bleu qui passe à travers le panneau de contrôle à l’interrupteur IPI/CPI. PF2 Basique (pas de télécommande): Coupez l’un ou l’autre des fi ls bleu qui va à l’interrupteur IPI/CPI.

Ce manuel est également adapté pour:

Pf2