Function Keys; Installation - Klarstein HOT SPOT CRYSTAL SPOTLESS SMART Mode D'emploi

Radiateur infrarouge
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
16

FUNCTION KEYS

Control panel

INSTALLATION

Wall installation
The unit must be installed at least 15 cm above the floor and at a minimum distance of
50 cm from the ceiling. Four fixed retaining screws (M8) are located at the rear of the
unit body.
The following accessories are included in the delivery:
1
Control panel
2
On/off button
3
Parental control
4
Timer button
5
Mode button
6
Raise temperature
7
Reduce temperature
8
Mounting bracket
9
Wall spacer
10 Washer
1 1 Fastening nut
12 Dowels
13 Screw 4*35 mm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10035063

Table des Matières