Télécharger Imprimer la page

Moen MB107C Mode D'installation page 5

Publicité

MODEL 4999
ROUGH-IN INSTALLATION DIRECTIONS
CAUTION: Always turn water OFF before disassembling faucet. Open faucet handles to alleviate water pressure to insure that
COMPLETE water shut-off has been accomplished.
Before turning water on, during either rough-in or trim out, make sure that cartridge retainer nuts are in place. The cartridge and cartridge
retainer nuts were properly installed and tested before leaving the factory. Although it is unlikely, it is nevertheless possible that through the
handling of the faucet by any number of persons the cartridge retainer nuts may not be properly installed. This should be carefully checked
at time of rough-in and trim-out. If the cartridge retainer nuts are not properly installed, water pressure could force the cartridge out of the
faucet body. Personal injury or water damage to the premises could result.
GENERAL INFORMATION
NOTE: When top of valve body is flush with top
mounting nut, valve body outlet ports will be 3-
1/2" below deck. Valve top locknuts and spout
retaining ring washer are to be on the same
plane.
LOCKNUT DIA. 1-5/8"
ESCUTCHEON DIA. 1-7/8" or 2-1/2"
VALVE BODY DIA. 1-1/8"
SPOUT SHANK DIA. 27/32"
VALVE BODY LOWER
MOUNTING WASHER DIA. 1-3/4"
SPOUT SHANK TOP
MOUNTING WASHER DIA. 1-5/8"
SCREW
STEM
EXTENSION
ESCUTCHEON
ADJUSTER
CARTRIDGE
RETAINER NUT
1248
CARTRIDGE
TOP
BRACKET
LOCKNUT
BOTTOM
VALVE
MOUNTING
WASHER
1/2" COPPER TUBE
(NOT FURNISHED)
BOTTOM
1-1/4" FOR STANDARD
VALVE BODY
INSTALLATION
MOUNTING NUT
3-1/2"
®
TOP OF
FINISHED SURFACE
SPOUT
COVER
TUBE
THREADED
FOR TEST PLUG
SPOUT
SHANK
RETAINING
RING
WASHER
LOCKNUT
(SELF-TAPPING)
(NOT FURNISHED)
4-5/8"
HI FLOW WIDESPREAD ROMAN TUB
THIN DECK
INSTALLATION
WASHER
LOCKNUT
FULLY
ENGAGED
3-1/2"
TUBE LENGTH TO MAKE
A 10" MAX CENTERSET
TO INSTALL VALVE BODIES
1. Turn valve mounting nuts all the way down on valve bodies
2. Slide valve bodies up through mounting holes and fasten front
3. Measure supply tubes on valve bodies to connecting tee (not
4. With valve bodies, tee, and spout tube assembled and proper-
5. Make final tightening of valve bodies and spout shank from
VALVE
COVER
TUBE
6. Connect supply lines with 1/2" copper fittings (not furnished).
SCREW
7. Install a test plug (not furnished) in spout shank.
TEE
8. Test installation for leaks.
9. Remove test plug from spout shank and proceed to install
THICK DECK
INSTALLATION
PROTECTIVE
PAPER
COVER TUBE
*
3/8"
MAX
BRACKET
for tub base clearance. Drop one mounting washer on each
side.
above temporarily with top locknut. Slide washer on spout
shank under retaining ring and put shank through center hole
of deck. Install bracket and mounting hardware.
furnished). Measure tube (not furnished) from tee to spout
shank. Cut them to suit.
ly aligned, hand tighten and solder where required.
below.
trim.
MT335F
TOP OF
FINISHED SURFACE
1-1/4" MAX
3/4" MIN
1/4" TO 1-1/2"
MAX BASE
*
3/8" Max. dimension shown is the
maximum height of valve body to
allow for supply tube "T" to
spout shank connection.

Publicité

loading