Festo ESBF-BS Notice D'utilisation page 18

Masquer les pouces Voir aussi pour ESBF-BS:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 36
ESBF-BS
Pressurising and exhausting the pressure compensation opening for variant ESBF-...-S1/F1:
• Screw a G1/8 fitting into the thread 4.
• Use a tube for the supply and exhaust of fresh air.
The exhausting process should be conducted in a protected
area (free from dust and moisture) or in a large pressure
reservoir. Alternatively, a slight excess pressure
(max. 0.2 bar) can be applied as sealing air.
Fitting in a vertical or sloping position:
Warning
Uncontrolled moving masses can cause personal
injury and material damage (risk of crushing).
If there is a spindle nut fracture inside the ESBF or
a toothed belt breaks
when using parallel kit EAMM-U (e.g. due to wear),
the effective load will fall down.
• Check whether additional external safety
measures against damage are required
(e.g. toothed latches or moveable bolts). In this
way you can prevent the work mass from slid-
ing down.
• Examine the toothed belt of the parallel kit reg-
ularly for wear
(
assembly instructions for the parallel kit).
Installing the effective load
• Place the centre of gravity of the effective load, if possible,
centrally to the piston rod.
• When securing the effective load make sure that no torque
is transferred to the piston rod.
The wrench flat 7 can be used to exert counter pressure.
• Secure the effective load to the piston rod.
The piston rod will bend depending on the effective load
(
Appendix 13 Characteristic curves).
Size
Piston rod thread
Male thread
Female thread
Width across flats 7
Tab. 2
18
63
M16x 1.5
M10
ß
[mm]
17
4
Fig. 5
Fig. 6
Fig. 7
80
100
M20x1.5
M20x1.5
M12
M12
22
22
Festo – ESBF-BS – 1201NH English
7

Publicité

Table des Matières
loading

Table des Matières