Electrode Setting; Turbulator Setting - Riello 40 Instructions Pour Installation, Utilisation Et Entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GB
INSTALLATION/REMOVAL
OF DRAWER ASSEMBLY
Removal:
A) Loosen off oil delivery tube nut
from pump.
B) Loosen SCREW (3), and then un-
plug CONTROL BOX (1) by care-
fully pulling it back and then up.
C) Remove the AIR TUBE COVER
PLATE (5) by loosening the re-
t a i n i n g
S C R E W
SCREWS – Model F5).
D) Loosen SCREW (2), and then
slide the complete drawer assem-
bly out of the combustion head as
shown.
E) To insert drawer assembly, re-
verse the procedure in items A to
D above.

ELECTRODE SETTING

IMPORTANT:
These dimensions must be observed and verified.

TURBULATOR SETTING

A) Loosen NUT (1), and then turn SCREW (2) until the INDEX
MARKER (3) is aligned with the correct index number as per
the Burner Setup charts, or OEM specifications given with the
appliance.
B) Retighten the RETAINING NUT (1).
NOTE: OEM specifications take priority over retrofit specifica-
tions shown in this manual.
MODEL F3: Zero and three are scale indicators only. From left to
right the first line is 3 and the last line 0.
MODEL F5: Same as above, except scale indicators are 0 and 4.
( 4 )
( Tw o
S8017
5/32" or 4 mm
D6003
5/64" to 7/64" or 2 to 2.5 mm
8
2
1
D7520
2903222
3

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

37261213726221

Table des Matières