CLEANING THE BOILER

To clean the boiler, proceed as follows:
- Open the front door (1) and remove the turbulators (2).
- Clean the inside surfaces of the combustion chamber and the flue gas path using a brush (3) or other suitable implements.
- Remove the deposits accumulated in the smokebox by opening the inspection door (4). For more intense cleaning, remove the
smokebox cover (5) and replace the gasket before reassembling.
- Periodically check that the condensate drain (6) is not blocked.

CHECKING THE OPERATION OF THE BOILER

Before staring and running the functional tests on the boiler, make sure that:
- The turbulators are positioned against the exchanger tubes.
- The cocks in the water circuit and on the fuel lines are open.
- Fuel is available.
- The expansion vessel is suitably filled.
- The pressure of the water circuit, when cold, is more than 1 bar and less than the maximum limit allowed for the boiler.
- The water circuits have been vented.
- The electrical connections to the mains power and the components (burner, pump, control panel, thermostats etc.) have been
completed).
- The phase-neutral connection must be observed, and the earth must be connected.
After having performed the operations described above, the following operations are necessary to start the boiler:
- If the system is fitted with a temperature controller or timer-thermostat, check that these are "on" .
- Set the room timer-thermostat or the temperature controller to the desired temperature.
- Move the main system switch to "on"
- Set the boiler thermostat located on the control panel.
- Move the main switch on the control panel to "on" and check that the green indicator light comes on.
The boiler will run the ignition phase and will remain on until the set temperature has been reached.
OPERATION AND MAINTENANCE