4
Confirm that the power recovery is active during a power outage.
① Set both the master breaker and the grid-tied breaker in the home breaker box to the OFF position.
The power outage error code "gxxx" should be displayed on the remote control panel.
② About 5 seconds after Step ① is performed, stand-alone operation starts.
"STAND-ALONE MODE" should be displayed and the status lamp will turn red.
③ Set both the master breaker and the grid-tied breaker in the home breaker box to the ON position.
④ After Step ③ is performed, "GRID CONNECT→" should be displayed. After about 5 minutes, the display changes
to "GRID TIED MODE" .
⑤ Press and hold the [RUN/STOP] button on the remote control panel for 5 sec or more to stop the grid-tied
operation.
"MANUAL GRID STOP" should be displayed and the status lamp will turn off.
When it takes 2 days or more for equipment to be delivered to a customer
●
Perform Steps ① to ③ below to stop the system. Perform steps ④ to ⑥ at the time of delivery to
restart the system.
(The storage battery over-discharge prevention function of the storage battery unit may trip unless
the system is stopped.)
●
After work is completed, reattach the front panels and the switch cover, and start grid-tied operation as
explained in the User's Manual.
■ System Shutdown
① Press and hold the [BACK] button on the inverter cabinet.
"ShtDwn" will be displayed on the cabinet LCD panel.
② Set the DC Switch-Disconnector on the outside of the inverter, the switch inside the storage battery unit and the grid-tied
breaker in the home breaker box to the OFF position.
③ Attach the front panels to the inverter cabinet and base, and turn the tab of the storage battery unit to close the
switch cover.
■ System Startup
④ Turn the tab of the storage battery unit to open the switch cover and set the storage battery unit switch to the
ON position.
⑤ Set the grid-tied breaker in the home breaker box to the ON position.
⑥ Detach the front panel from the inverter cabinet and set the DC Switch-Disconnector to the ON position.
36
(Grid-tied operation starts)