Tabuchi Electric EneTelus EHW-S55P3B-PNUS Manuel D'installation page 26

Masquer les pouces Voir aussi pour EneTelus EHW-S55P3B-PNUS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6
Stop stand-alone operation.
If 2 or more days are required to confirm grid-tied operation.
Perform steps ① to ④ and stop the system.
The over-discharge prevention function of the storage battery unit may trip unless the system is stopped.
*See below.
(To start grid-tied operation, restart the system.)
To check grid-tied operation now, perform steps ① to ③ and proceed the "Parameters List" on page 28,
without attaching the front panel of the cabinet and the front panel of the base shown on the next page.
① Press and hold the [RUN/STOP] button for 5 sec or longer to stop operation.
The status lamp will go out.
② Press and hold the [BACK] button on the inverter cabinet.
"ShtDwn" will be displayed.
The storage battery unit stops discharging/charging and shuts down.
③ Set the DC Switch-Disconnector on the inverter to the OFF position.
④ Set the switch inside the storage battery unit to the OFF position,
and turn the tab to close the switch cover.
Over-discharge prevention:
The storage battery unit cannot be charged without power supplied from the commercial power grid or solar panels.
If the storage batteries are not charged for 2 days or longer when the remaining charge is 0% and the storage battery unit
switch automatically turns off to prevent over-discharging.
If the over-discharge prevention function trips, set the switch to the ON position so as to enable charging of the storage
battery.
26

Publicité

Table des Matières
loading

Produits Connexes pour Tabuchi Electric EneTelus EHW-S55P3B-PNUS

Table des Matières