Start-up in Battery Mode (Cold Start)
1. Make sure the UPS has already been installed with batteries.
2. Press the UPS ON switch to awake the UPS for approx. 3 seconds, and then the
buzzer sounds twice. The LCD display will illustrate from Drawing A to drawing G.
G
3. Press the UPS On switch of the UPS again for approx. 3 seconds till the LCD display
illustrates from drawing G to drawing H, and then the UPS will be in self-test Mode.
The UPS may offer energy to the output in a minute, and the LCD display illustrates
as drawing I. In case of failure in pushing the UPS Off Switch in 10 seconds, the
UPS will automatically turn off.
H
I
Note: *Ensure the UPS Battery is pre-charge for minimum 4 hours by simply
connecting the AC power cord to the Utility receptacle.
Check Measured Values & Figures detected by UPS
4. If you would like to check the measured values & messages, please use scroll up
and scroll down
display will illustrate in sequence from Drawing E (Input Voltage) Drawing J
(Input Frequency) Drawing K (UPS Output Voltage) Drawing L(UPS Output
Frequency) Drawing M (UPS Output Load percentage) Drawing N (UPS
Battery Voltage) Drawing O (UPS) inner temperature
J
K
L
INFOSEC UPS SYSTEM – 4 rue de la Rigotière – 44700 Orvault – France – www.infosec-ups.com
43
Hot Line Tel : +33 (0)2 40 76 15 82 – fax : +33(0)2 40 94 29 51 – hotline@infosec.fr – 06 11 AA 68 203 03
key pads. When you use scroll down key pad, the LCD
M
N
O