Axis Communications 291 1U Mode D'emploi page 15

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
2
Recessed screws (M3x8)
4. Slide the AXIS Video Server Rack into the equipment rack and attach the screws.
3
Screws (M6x20)
Install Blade Video Servers
The AXIS Video Server Rack can accommodate three Axis blade video servers. The slots for these
are numbered 1-3 from left to right, as seen from the front. The I/O connectors for each slot on
the rear panel are also numbered.
NO
NO TICE
NO
TICE
TICE
Leaving an empty slot on the AXIS Video Server Rack open is not permitted. Front panel
covers must be used on all empty slots.
1. Remove a front panel cover from the slot in which the video server will be mounted. This
is done by loosening the screw on each side of the cover.
2. Use the guides as an aid to slide the video server into place. The dip switch for setting
the line termination should be visible on the top edge.
3. Use the screws from the front panel cover to attach the video server.
AXIS 291 1U Video Server Rack
15

Publicité

Table des Matières
loading

Table des Matières