Dell PowerEdge C5125 Guide De Mise En Route page 6

Masquer les pouces Voir aussi pour PowerEdge C5125:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1 Pull on the latch release buttons on the end piece midpoints to open the
rail latches.
2 Align the end pieces of the rails on the vertical rack flanges to seat the pegs
in the bottom hole of the first U and the top hole of the second U. Engage
the back end of the rail until the latch locks in place.
NOTE:
The rails can be used in both square-hole and round-hole racks.
4
Installation and Configuration
Front
Back

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

B04s

Table des Matières