Emerson EUCLID CF500AP00 Mode D'emploi page 9

Masquer les pouces Voir aussi pour EUCLID CF500AP00:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BP7519 Euclid CF500-ESF.qxp_CF500 12/2/16 11:17 AM Page 9
3.11
Route the two motor leads through the hanger ball
(Figure 11).
Reinstall the hanger ball on the downrod as follows:
Position the pin through the two holes in the downrod and
align the hanger ball so the pin is captured in the groove in
the top of the hanger ball (Figure 11).
Pull the hanger ball up tight against the pin and securely
retighten the Phillips head set screw in the hanger ball
(Figure 11).
A loose Phillips head set screw could create fan wobble.
3.12
The fan comes with black, blue and white leads that are
80" long.
Measure up approximately 6 to 9-inches above top of
hanger ball / 4.5" downrod assembly (Figure 12).
Cut off excess leads and strip back insulation 1/2-inch from
end of leads.
3. Ceiling Fan Assembly
(Continued)
4.5" DOWNROD
PHILLIPS HEAD
SET SCREW
Figure 11
1/2-INCH
6 TO 9
INCHES
Figure 12
Please contact 1-800-654-3545 for further assistance
9
PIN
HANGER
BALL
BLUE WIRE
BLACK WIRE
WHITE WIRE
HANGER BALL
emersonfans.com
U.L. Model No.: CF500

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Euclid cf500bs00Euclid cf500orb00

Table des Matières