Refitting Procedure:
Mount tripod (1) on tripod
holder (2) at weighing
platform
Ensure that the cable (3)
does not get clamped!
Fasten tripod, using 4 screws
15
Level balance with foot screws until the air bubble of the
water balance is in the prescribed circle.
Check levelling regularly.
MPE-BAPS-e-2121