Installation And Electrical Connection; Installation Of The Vm100 - SIKA VM100 Notice D'utilisation

Controleurs de debit a piston pour des applications marine
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and electrical connection

4
Installation and electrical connection
Before installing the VM100, check that
 the equipment is switched off and is in a safe and de-energised state.
 the equipment is depressurised and has cooled down.
SUITABLE TOOLS:
 Use only suitable tools of the correct size.

4.1 Installation of the VM100

The flow monitor is self-supporting and can therefore be fitted in any pipeline.
Installation instructions:
Firstly, clean the pipe system in which the flow monitor is to be installed and remove
any magnetic particles, e.g. welding residue.
The preferred installation position is upright vertical in horizon-
tal pipelines.
However, it is also possible for the upper part to deviate from
the vertical by up to 70°
In movable systems subjected to impact or vibration stresses,
the flow monitor should only be installed vertically in horizontal
pipelines.
Please make sure that there are no external magnetic fields in
the immediate vicinity of the flow monitor, since these can im-
pair device functioning
Large ferromagnetic parts can effect the magnetic action of the
flow monitor and endanger operational safety. For this reason,
never install the VM100 near such parts.
- 24 -
© SIKA • Ba_VM100 • 03/2014
VM100

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vm 115Vm 120Vm 125Vm 132Vm 140Vm 150 ... Afficher tout

Table des Matières