Leak Testing; Start-Up - GOK 261230 Instructions De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25
Possible LPG withdrawal volume with 33 kg cylinders
Type of
withdrawal
Short-term
Periodically
Constant
withdrawal
These values apply to withdrawal from the operating cylinders. The withdrawal volume of LPG
corresponds to the gas consumer of all connected gas appliances.

LEAK TESTING

Serious burns to the skin or damage to property.
Do not use an open flame to check for leaks.
Leak testing before start-up, check the product connections for leaks.
1. Close all shut-off fittings on the gas appliance.
2. Slowly open the gas vapour or the gas cylinder valve(s).
3. Spray all connections with a foam producing substance according to EN 14291
(e.g. leak spray, item no. 02 601 00).
4. Bubbles will form in the foam producing substance if there are any leaks.
you cannot stop the leaks, you must not use the product.
Observe the applicable national installation regulations for LPG systems.

START-UP

After the product has been ASSEMBLED and LEAK TESTING has been carried out
successfully, it is immediately ready for operation.
1. All shut-off fittings on the connected devices must be closed.
2. Slowly open the withdrawal valve or the gas cylinder valve.
3. Observe the assembly and operating instructions of the connected devices.
If you open the withdrawal valve or the gas cylinder valve too quickly, this can result in
a short-term pressure increase that triggers the overpressure shut-off device (OPSO).
If the visual indicator switches to RED during start up, do the following:
• Allow a few short bursts of gas to escape from the connected device to equalise the
pressure.
• If the pressure does not equalise and the OPSO cannot be unlocked
(visual indicator remains RED), the pressure regulator must be replaced.
When the pressure regulator is put into service, the display unit must be GREEN.
If the initial pressure rises over 80 mbar (models with 29 and 50mbar outlet pressure), the
display unit will change to RED. See TROUBLESHOOTING.
Observe the operating instructions enclosed with the product.
20 / 36
Two
cylinder system
3.0 kg/h
1.8 kg/h
0.6 kg/h
Risk of burning or fire.
If more bubbles form, re-tighten the connections (see ASSEMBLY). If
Four
cylinder system
6.0 kg/h
3.6 kg/h
1.2 kg/h
Six
cylinder system
9.0 kg/h
5.4 kg/h
1.8 kg/h
Artikel-Nr. 05 075 51 e

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

61235261240

Table des Matières