Cornelius CANYON Instructions D'assemblage page 17

Masquer les pouces Voir aussi pour CANYON:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4
SRTAIGHT SECTION BUTTRESS ASSEMBLY (continued)
2) Refer to Illustration 4.2. Assemble the post using bolts 1/2" X
3" X #13 (12,7 mm X 76,2 mm) (U), nuts (UU) and washers (V).
Remember to insert a spacer (T) and two washers (V) inside the
beam aligned to each bolt.
BUTTRESS POST
5
BOTTOM TRACKS (STRAIGHT) AND PRESSURE PLATES
1) Position the buttress pillars assembled in Step 4 on the patio
blocks in the trenches previously dug.
2) Refer to Illustration 5.1 : Once the buttress pillars are placed
in the trenches, assemble the straight section bottom tracks (J) be-
tween the pillars on the foot beams.
3) Refer to Illustration 5.2 : Fix the pressure plates between
Illustration 5.1
BOTTOM TRACK
STRAIGHT SECTION
3) Refer to Illustration 4.3. Cover the bolt heads with bolt caps
(W) and insert the styrofoam caps (X) at both ends of foot beam.
Illustration 4.2
Illustration 5.2
Illustration 4.3
1/2" BOLT CAP COVER
STYROFOAM CAP
STANDARD
SCREW #14
PRESSURE PLATE

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sunset

Table des Matières