Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22

4. Installation

4.1
GB
Checking the clearance and the required the installation space
≥ 350
(450*)
Use the sealing profile for the top side as a connection between the vertical gui-
de rail columns (this also serves to check the distance of the internal width).
For this purpose lay the sealing profile on the ground.
* With cover
10
≥ 650 (700*)
≥ 250
(350*)
X
X
4.2
Attaching the column to the driving side
X
Place the column with the driving side on the ground to match the
width of the sealing profile and set it upright.
Remove the screws from the cover and fold open the column.
Attach the column provisionally to the door frame with two glue
clamps.
Measure a user-defined height of the sealing profile (X) on to the
column (see illustration).
GB
11

Publicité

Table des Matières
loading

Table des Matières