1. Place 8" round adapter on top of power pack
and secure with (4) M4x8 screws. Connect 8"
round duct work to 8" round adapter.
B
3. Place cap over threaded end of remote blower
wiring and secure by turning clockwise.
A: Ground wire screw
location (inside)
A B
A
5. Secure green ground wire from remote
- elec k/o
blower wiring to ground screw located
B
- ext blower k/o
inside the power pack
NOTE: For instructions on installing remote blowers, please refer to the CBE-1000 or PBN-1000A
manuals included in the blower packaging and on our website: www.zephyronline.com
2. Install threaded end of remote blower wiring
through external blower wiring knock out (B)
located in junction box on top of power pack.
A
- elec k/o
B
- ext blower k/o
4. Connect 6 pin male connector from blower
wiring to 6 pin female connector in the power
pack. (plug is located inside the power pack
protruding from the white control board box).
CBE-1000 / PBN-1000A: WIRING DIAGRAM
A
Remote Blower
Wiring Box
(hood)
12
www.zephyronline.com
B
A B
White (common)
Black (high)
Junction Box
Blue (med)
(Remote Blower)
Red (low)
Green (ground)